Our portfolio of past projects is testament to our ability to deliver projects of varying sizes, scopes, duration, and differing degrees of risk and difficulty.

Yoganup Mining Rehabilitation Project

CLIENT: Iluka Resources

LOCATION: Capel, Western Australia

VALUE: $3 million

DURATION: 2018-2019

SCOPE OF WORK:
Rehabilitation services comprising reconstruction of the soil profile within the disturbed areas returning site back into dairy pasture, utilising a combination of dozers, trucks, an excavator and a tractor scoop.

Tutunup Mining Rehabilitation Project

CLIENT: Iluka Resources

LOCATION: Busselton, Western Australia

VALUE: $10 million

DURATION: 2018-2019

SCOPE OF WORK:
Rehabilitation services comprising backfilling all pits, reconstruction of soil profile within all disturbed areas, reformation of landform profile, cleaning, drying and rehabilitation of 14 slimes dams, reinstatement of sensitive wetlands in line with the client's rehabilitation plan.

Imperial Majestic Gold Project

CLIENT: Silver Lake Resources

LOCATION: Kalgoorlie, Western Australia

VALUE: $49 million

DURATION: 2016-2018

SCOPE OF WORK:
Establishment of a greenfield gold mine and mining services involving clearing and grubbing, removal and stockpiling of topsil, drill and blast, pit formation, mine, load and haul over 25 month period utilising excavators and dump trucks.

Axehandle Gold Project

CLIENT: Minjar Gold

LOCATION: Southern Cross, Western Australia

VALUE: $91 million

DURATION: 2015-2017

SCOPE OF WORK:
Operational mining services for one open pit mine, executed in two stages with ultimate pit size being 1.1km long by 350m wide, and a depth of 160m. Clearing, grubbing and excavation were performed utilising a mix of 657 scrapers, 200t and 120t class excavators, 777 dump trucks and smart drill technology to achieve over 625,000 BCM per month.

Kathleen Valley Gold Project

CLIENT: Ramelius Resources

LOCATION: Leinster, Western Australia

VALUE: $28 million

DURATION: 2015-2016

SCOPE OF WORK:
Development of a small open cut pit for 1 1/2 years, with scope of work inclusive of clearing and grubbing, removal and stockpiling of topsoil, drill and blast, load and haul of ore and waste, and formation of mine site. Other activities involved the establishment of site access roads, construction of site bunding and drainage channel, and rehabilitation of waste landform.

Cornishman Gold Project

CLIENT: Minjar Gold

LOCATION: Southern Cross, Western Australia

VALUE: $58 million

DURATION: 2014-2016

SCOPE OF WORK:
Mining services involving the extension of the existing pit to the south and west to a depth of approximately 130m. Excavation was performed utilising a mix of 657 scrapers, 200t and 120t class excavators and 777 dump trucks, along with smart drill technology, to achieve mining of over 1 million tonnes per month.

Coogee Gold Project

CLIENT: Ramelius Resources

LOCATION: Kalgoorlie, Western Australia

VALUE: $8 million

DURATION: 2013-2014

SCOPE OF WORK:
Establishment of the Coogee open pit mine, including clearing, grubbing, and stockpiling of topsoil, drill and blast, load and haul ore and waste utilising 120t excavators and a fleet of 50t articulated dump trucks. Scope also involved rehabilitation activities.

Cockatoo Island Iron Ore Project

CLIENT: Pluton Resources

LOCATION: Cockatoo Island, Western Australia

VALUE: $129 million

DURATION: 2012-2015

SCOPE OF WORK:
Complete project management, mine scheduling and planning, and provision of operational mining services. This included clearing, grubbing and stockpiling of topsoil, drill and blast, load and haul, rehandling and blending, crushing and screening, and shiploading. All other infrastructure services include the operation and maintenance of shiploading infrastructure, and management of camp village, communications infrastructure, aerodrome, barges and aircraft to and from the island.

Mount Magnet Gold Project

CLIENT: Ramelius Resources

LOCATION: Mount Magnet, Western Australia

VALUE: $253 million

DURATION: 2011-2017

SCOPE OF WORK:
Operational mining services, including drill and blast, load and haul of waste and ore, and shaping of waste dumps at the Blackmans, Titan and Brown Hill pits in the Mt Magnet tenements over a 6 year period.

Woornack Rownack Pirro Mineral Sands Project

CLIENT: Iluka Resources

LOCATION: Ouyen, Victoria

VALUE: $180 million

DURATION: 2011-2016

SCOPE OF WORK:
Mining services in two mineral sands pits that stretch for 14km over a number of soft dunal sands, utilising a combination of conventional trucks, excavators, scrapers and tractor scoops, thereby increasing efficiency of the mine whilst minimising costs and environmental impacts.

Tutunup South Mineral Sands Project

CLIENT: Iluka Resources

LOCATION: Busselton, Western Australia

VALUE: $67 million

DURATION: 2010-2018

SCOPE OF WORK:
Establishment of greenfields mineral sands mine, all site civil and mining works including construction of road and tailings dam, clearing and grubbing, mining of ~15 million BCM of ore and waste sand over a seven year period utilising excavators and dump trucks. Additional scope involved the maintenance of 14 slimes dams.

Nullagine Iron Ore Project

CLIENT: BC Iron

LOCATION: Nullagine, Western Australia

VALUE: $386 million

DURATION: 2010-2015

SCOPE OF WORK:
Surface mining of ore and waste up to 10 million tonne per annum, the design and commissioning of a full electric drive crushing and screening plant, surface mining of mesas, load and haul, and blending and processing of DSO product.

Pajingo Gold Project

CLIENT: Evolution Mining

LOCATION: Charters Towers, Queensland

VALUE: $36 million

DURATION: 2010-2013

SCOPE OF WORK:
Completion of two pits totalling 1 million BCM and 2.5 million BCM respectively. Scope of work inclusive of drill and blast, load and haul, rehabilitation of waste landform, and transportation of ore to the mill for processing.

Douglas and Echo Mineral Sands Projects

CLIENT: Iluka Resources

LOCATION: Horsham, Victoria

VALUE: $74 million

DURATION: 2010-2012

SCOPE OF WORK:
Mining services in multiple mineral sands pits and transporation of ore feed to client mining unit on a 24/7 basis, utilising a large fleet of excavators, trucks, dozers and loaders.